03-21 Jianlibao Group Carbonated Drink Production Line Energy Drink Production Line Klantenwebsite

Productielijn voor flessen met dranken
March 21, 2025
Category Connection: Verpakkingsmachine voor dranken
Brief: Explore the Jianlibao Group Carbonated Drink Production Line and Energy Drink Production Line at a customer site. This video showcases the advanced equipment and efficient processes for producing carbonated and energy drinks, including pre-treatment, filling, capping, labeling, and packaging systems.
Related Product Features:
  • Whole plant planning and production line layout design for carbonated and energy drink production.
  • Pre-treatment system, blowing, filling, and capping all-in-one machine for seamless operation.
  • High-speed labeling machine for bottle body and neck labels, ensuring precision and efficiency.
  • Output capacity ranging from 6,000 to 48,000 bottles per hour to meet diverse production needs.
  • Advanced electrical control system with PLC and frequency converter for smooth automation.
  • Includes auxiliary equipment like finished product detection, liquid level detection, and inkjet printers.
  • Quality assurance with 12-month warranty and 24-month warranty for control systems.
  • Customizable solutions for various bottle types and beverage categories, including juice, tea, and dairy.
Vraagstukken:
  • What is the production capacity of the Jianlibao Group Carbonated Drink Production Line?
    The production line can output between 6,000 to 48,000 bottles per hour, depending on the configuration and requirements.
  • What types of beverages can this production line handle?
    This production line is versatile and can handle carbonated drinks, energy drinks, juice, tea, protein drinks, dairy, functional beverages, and plant-based drinks.
  • What is the warranty period for the equipment?
    The equipment comes with a 12-month warranty, and the control systems have a 24-month warranty. Spare parts and technical support are provided during the warranty period.
  • How long does it take to deliver the production line after order confirmation?
    The delivery time is approximately 60 working days from the receipt of the customer deposit and product packaging samples.